Friday, June 29, 2012

June 30th...it's a hot one!

With the heat, this one will be short and sweet.  We'll work our way over to Old Sauk, will take a right at Timber Lane, Left on Old Sauk Pass, Left on Stagecoach, Right on P (go through Cross Plains on Church/P), Left on Hillpoint, Right on Enchanted Valley, Left on Schneider and back to Harbor.  Not a long ride but it has some good hills!  Under 30 miles total.

Friday, June 22, 2012

Saturday the 23rd. Riley Ride!

At 7:30am we'll roll out, heading for Riley.  The cue sheet is a bit obscure since we'll be winding around to avoid some construction.  Sorry if there are mistakes.  The ride is about 35 miles long with some rolling hills.

L on Century
R on Maywood
L Park
R Elmwood, wrap around
R on Terrace
L Demming
R Blackhawk
L Swallowtail (this is where it's a bit tricky...essentially, we are getting over to Old Sauk Rd)
R Old Sauk
L Pioneer
R
L Mound View
R Mid Town
L Timber Lane
R Paulson
R J (somewhat yucky road conditions on J)
R Maurer
L Timber
R Cleveland
L 14
R Rocky Dell
L Airport
R Enchanted Valley
R Schneider and then back to Harbor

Thursday, June 14, 2012

Saturday June 16th

Lodi bound!  At 7:30am we'll head out on a longer, hillier route to Lodi and back if the weather cooperates. About 40 miles.

Wednesday, June 6, 2012

Saturday the 10th/Martinsville Loop

So we'll be riding easy this week since I'll be in recovery from long miles all week.  We'll do the Martinsville Loop at a moderate pace, leaving from Harbor at 7:30am sharp.


R Allen




L Century



R Pheasant Branch



L Meffert



R Kingsly



L Woodland



R Lodi/Springfield



L P



R Martinsville



L K



R Otto Kerl



L Enchanted Valley



L Schneider



R Parmenter



L Graber



back to Harbor