Friday, May 31, 2013
Saturday June 1st
This week we'll be doing a bit of an easy spin. We'll head over to Old Sauk Rd. and go Southwest to Riley. We'll loop back on Maurer Hill, Timber Lane, Cleveland (down!) and up Rocky Dell to come back to Harbor on Airport. Nice, not too long, not too hilly. 7:30am rollout.
Wednesday, May 22, 2013
Saturday, May 25th
Please note that we will be riding at 8am this week! This week's ride will be longer and hilly. About 55 miles of solid hills. We'll be heading West on Enchanted Valley, will drop down into Black Earth, will head West a bit further and will then hill all the good climbs--Sutcliffe, Moen, Union, Vermont Church etc. Although the pace will be a little slower due to the hills, please come prepared.
Thursday, May 16, 2013
Thursday, May 9, 2013
May 11th ride
Looks like it will be chilly and breezy. Short ride this Saturday--the Martinsville Loop.
North on Pheasant Branch, left on Meffert, right on Kingsley, left on Woodland, right on Lodi-Springfield, left on P, right on Martinsville, left on K, right on Otto Kerl, left on Enchanted Valley, left on Schneider all the way back. 7:30am rollout.
North on Pheasant Branch, left on Meffert, right on Kingsley, left on Woodland, right on Lodi-Springfield, left on P, right on Martinsville, left on K, right on Otto Kerl, left on Enchanted Valley, left on Schneider all the way back. 7:30am rollout.
Subscribe to:
Posts (Atom)
